David Oluwale bridge installation

28 Mar 2022

The David Oluwale bridge is lifted into place over the River Aire in Leeds. Engineers working on the David Oluwale bridge completed one of the project’s major milestones over the weekend, with cranes carefully placing the 40 tonne structure over the river where it will connect Sovereign Street to Water Lane.

David Oluwale bridge installation: The David Oluwale bridge is lifted into place over the River Aire in Leeds. Engineers working on the David Oluwale bridge completed one of the project’s major milestones over the weekend, with cranes carefully placing the 40 tonne structure over the river where it will connect Sovereign Street to Water Lane.
Download
8105-020-David Oluwale Bridge Install.jpg (5472px * 3648px - 9.6 MB)